9.2 2 Iso

Compliance Management, ISO Standards, Management Systems, Occupational Health & Safety

  • In this blog, I will discuss clause 9.2 of ISO - internal auditing.
  • I don't have much info on this release, so I'll go by its release notes. According to them, this release is actually based on a post-RC2, near-final build of Mandrake Linux 9.2 for x86, as the amd64 and x86 development cycles for a lot of Linux distros were not in sync at the time.

ISO 45001:2018, the Occupational Health and Safety Management System standard was published in early March 2018. This is the twenty-second in a series of blogs, in which we describe what the implementing company must do in order to meet the requirement of the standard. We will now look at clause 9.2: Internal audit.

ISO 45001:2018 – Clause 9.2: Internal Audit

Clause 9.2.1 General

Section 9.2 ISO Internal Audit ISO Internal Audit In order to confirm that the EMS conforms to the ISO standard and the organization’s standards, internal audits must be conducted at planned intervals. Our range of templates cover the requirements of ISO 9001:2015, ISO and ISO, and offer an easy way to implement your next management system. 9.2 Internal audit « Previous Next » The guidance shown on this page is relevant to ISO 9001, ISO 14001 and ISO 45001.

The organisation must conduct internal audits at planned intervals to provide information on whether the OH&S management system conforms to the organisation’s own requirements for its OH&S management system, including the OH&S policy and OH&S objectives and the requirements of ISO 45001. In addition, the audit allows the organisation to determine if its OH&S management system is effectively implemented and maintained. The extent of the audit programme should be based on the complexity and level of maturity of the OH&S management system.

(ISO)9.2 2 Iso

Clause 9.2.2 Internal Audit Programme

The organisation must plan, establish, implement and maintain an audit programme, which contains information on:

  • The frequency that audits are conducted;
  • The methodology/protocol used (should be in general conformance with the requirements of ISO 19011:2011 Guidelines for auditing management systems;
  • Who is responsible for managing and conducting audits;
  • What consultation takes place with auditees and the general workforce;
  • How the audits are planned and implemented;
  • The format for reporting audits.

The planning of the internal audit programme must recognise the importance of the processes concerned and the results of previous audits. This would be reflected in the audit programme being based on the results of the risk assessments of the organisation’s activities and the results of previous audits, which in turn would guide the organisation in determining the frequency of audits of particular activities, areas or functions and what parts of the OH&S management system should be given attention.

The OH&S management system audits should cover areas and activities within the scope of the OHSMS as defined by clause 4.3 of the standard and also assess conformity to ISO 45001.

The organisation must define the audit scope and audit criteria for each audit. Audit evidence should be evaluated against the audit criteria to generate the audit findings and conclusions. Audit evidence should be verifiable.

Prior to conducting the audit, the auditors should review appropriate OH&S management system documented information, and the results of prior audits. This information should be used by the organisation in planning for the audit.

Apple

The organisation must select auditors and conduct audits to ensure objectivity and the impartiality of the audit process. It can establish objectivity and impartiality of the internal audit process by creating a process that separates auditors’ roles as internal auditors from their normal assigned duties. Alternatively, it can utilise the services of external companies to conduct its internal audit programme.

After the audit is complete the auditors must ensure that the results of the audits are reported to relevant managers. In addition, relevant audit results must be reported to workers; where they exist, to workers’ representatives and to other relevant interested parties.

The organisation must take action to address nonconformities in a timely and efficient manner and continually improve its OH&S performance. The audit report should be clear, precise and comprehensive.

The organisation must retain documented information as evidence of the implementation of the audit programme and the audit results.

Tags
H&S , Health & Safety , ISO 45001 , Occupational Health & Safety , OHS , OHSAS 18001
Related Posts
WRC Code of Practice for Employers and Employees on the Right to DisconnectRisk Assessments for COVID-19: your responsibilities as a companyYour responsibilities for remote workersThe importance of office ventilation during the Covid-19 epidemicCOVID-19 Legislation and Guidance Update October 2020UK and Ireland: COVID-19 Legislation and Guidance UpdateThe Covid-19 Emergency in EuropeUK and Ireland: COVID-19 – What the legislation and guidance is saying?Ergonomics – Importance in the Workplace and Employer’s ResponsibilitiesLegislation Update Ireland: New Ionising Radiation Regulations 2019

Categories

Archives

9.2 2 Iso
  • 2021
  • 2020
  • 2019
  • 2018
  • 2017
  • 2016
  • 2015
  • 2014
  • 2013
  • 2012

See Pegasus in action

The best way to understand what Pegasus can do for you, is to see it in action. Request a demo and one of our consultants will set-up a quick online tailored demo to run through the relevant aspects of the service.

This release is an early beta preview and as such should not be installed on a primary device. We strongly recommend proceeding with caution.


What’s new

  • Fixed an issue where the Apple Watch would not receive notifications while jailbroken
  • Improve reliability of entering DFU mode
  • Fixed an issue where checkra1n could not be used on macOS 10.10

This beta adds an option to boot into no-substrate mode. To utilize this functionality, hold the volume-up button when the apple logo appears until the device finishes booting. From there you’ll be able to uninstall any tweaks causing you issues and reboot to get back to a normal jailbroken state.

Unsupported devices

checkra1n will eventually support all devices between the iPhone 5s and the iPhone X, however, this beta lacks support for the following devices:

  • iPad Air 2
  • iPad 5th Gen
  • iPad Pro 1st Gen

Support for these devices will be added in a later release.

Apple Mac OS 9.2.2 [PowerBook G4] (ISO)

Support for the following devices is experimental, and may require more attempts than usual:

  • iPhone 5s
  • iPad Mini 2
  • iPad Mini 3
  • iPad Air

Reliability on these devices will be improved in future releases.

ISO 27001 Annex A.9 - Access Control

Unsupported platforms

This beta is only available for macOS. Work is ongoing to support Windows and Linux, which will be added in a later release.

Package managers

Apple Mac OS 9.2.2 (ISO) (Bad?)

At the moment, checkra1n only supports installing Cydia. Support for other package managers is coming soon, and will not require a checkra1n update.